Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Recent Projects
Aptamer York. Innovation way, heslington york.
Commercial Property
This three story office block next to the University of York needed a full stripout, with internal demolition of partition walls with soft strip of all suspended ceilings, radiators, floor tiles back to shell. It was a pleasure to work with Park Laine on this project with a efficient completion and smooth handover.


Rowlandson house, Finchley, North London. strip out 20,000 square foot office to residential conversion
Commercial Property
Full internal strip out back to shell, certified air conditioning gas purging and removal. All internal walls, floor coverings, suspended ceiling plus all redundant M&E within the ceiling void to be removed and disposed of. Staircase demolition and plant room strip out.
No element of the existing was in retention.
On this site we evacuated over 100 Tonnes of waste from the building, all recycled where possible and 100% diverted from land fill.
Highpoint Providence street Bradford city centre BD1 2QU
Commercial Property
The previous headquarters for the Yorkshire building society which was already under redevelopment works required all of its 600+ windows removed by means of external mass climbers on each elevation.The aluminium framed windows weighed circa 60kg each depending on their various shapes and sizes, the external trim was to be retained for the new windows to be retro fit onto the existing trim.
The 1st phase of these works were completed with 100% of all glass and aluminium recycled. With phase 2 of these works looking likely to start before summer 2022.


Tyler’s house, Southend on sea south east coast near Essex. 13,000 square foot office refurbishment.
Commercial Property
Two stories (ground and first floors) of this partially occupied / tenanted building were stripped out back to the retained communal areas. The former Southend on sea court rooms were to be completely ripped out with a few aspects to be kept in retention being - air conditioning internal cassettes and external pumps, fire alarm/smoke detection circuit and the raised floor for below fed services.
This site had strategic planning to help both existing tenants and our operatives work together whilst being compliant with COVID guidelines, and maintain the site / public safety. 35 tonnes of waste was evacuated and recycled from this site.